Moline High School PE Facility

  • Student lounge/study area
  • Main corridor
  • Athletic training room
  • Track and basketball courts
  • Weight room w/ turf

Russell completed a new physical education (PE) addition to the Moline High School campus using approximately 20,000 s.f. of existing gym and locker room space and approximately 66,000 s.f. of new building expansion.

The project scope includes: (4) full-size basketball courts and multi-sport courts (basketball, tennis, and volleyball), enclosed by a six-lane 200-meter track, field event areas and retractable batting cages suspended from the ceiling. The facility also features an 8,000 s.f. state-of-the-art weight room and a wrestling room of approximately 4,000 s.f. Additionally, the project includes restrooms, athletic support spaces, locker rooms, equipment storage and a new common area. The new common area connects the physical education facility with the cafeteria. In what used to be a bottleneck for school traffic, this area will provide a space for students to spread out to study, dine or connect.

This project took place in two phases – Phase I included the interior renovation (locker rooms and weight room), which was turned over before 2020-2021 school year started. Phase II included the rest of the scope and finished in December 2020.

Wrestling Room
Basketball Courts
Moline branding on wall