Russell is serving as Construction Manager at Risk for the 62,785 s.f. Hodge facility in Dubuque, Iowa, a maintenance, sales, and rental center for forklifts and related equipment. Approximately half of the building is occupied by Hodge’s operations, with the remaining half built as flexible shell space that can serve as future heavy mechanic space or be leased to a third party. The project includes:
- Heavy equipment service bays with 27-foot clear height, two 2-ton overhead cranes, vehicle lifts, a paint booth, and a tire press
- Wash bay, tire changing station, and fabrication area
- Battery rebuild and service area with charging and reactivation capabilities
- Parts room with counter and racking sales space
- Sales offices
- Three loading docks
- Shell mezzanine for future build-out
- 53 parking spaces
Understanding Hodge’s need for significant flexibility, Russell provided 48 alternates and maintained a proactive approach to value engineering, identifying cost-saving opportunities throughout construction. A phased procurement strategy allowed earthwork and long-lead items to be released before design was complete, keeping the project on schedule. Russell also identified and resolved a design issue at the loading dock before it affected the field, and helped Hodge develop a financial strategy to defer costs by removing paving from the base scope.