This mission critical project is a fast-track Design-Build renovation and expansion of an existing data center, converting a legacy 6 MW facility into a 24 MW IT compute environment within a compressed 12-month schedule—from design kickoff through commissioning. The project represents Phase 1 of a larger two-phase master plan engineered to support high-density compute.
The project was executed within severe geographic and site constraints, requiring tightly coordinated logistics and construction sequencing.